MOLD IDENTITY / ENGINEERING DATA / RUNTIME SCOPE

Injection Molding Mold Identification and Data Interface Checklist

Release one identified mold-to-machine data relationship through controlled asset identity, engineering-record sources, configuration and cavity state, runtime scope, permissions and as-built evidence—not through a digital-mold or OPC UA label.

ANSWER FIRST

A mold identifier links evidence; it does not release the mold, machine or process.

Put the buyer-controlled mold and article records beside the exact proposed endpoint, supported data scope, authority and configured observations. Preserve source status, assumptions, exclusions and conflicts from RFQ through as-built handover.

Build the fixed mold-data interface brief
Release package
  • Controlled mold, article, document and machine identities
  • Static engineering source separated from runtime exchange
  • Configuration, cavity, value, counter and maintenance semantics
  • Explicit read, write, event, access and safety boundaries
  • Configuration-specific evidence, deviations and as-built control
INTENT / OWNERSHIP

Keep one mold-data relationship separate from nine adjacent decisions.

Each row assigns ownership and rejects what the data record cannot release.

Decision ownership and adjacent scope to keep separate
DecisionOwnsKeep separate
Identified mold data relationshipOne mold's controlled asset identity, article and engineering-record references, runtime endpoint scope, configuration/cavity state, permissions, evidence and as-built handover for one identified machine/cell.It does not prove a digital-mold function, standard implementation, physical fit, safe operation, process capability, part quality or production release.
Mold envelope and injection-unit fitMold dimensions, mass, opening/ejection demand, shot-volume and plasticizing questions used to shortlist the machine.An asset record or data endpoint cannot prove that the mold fits the clamping and injection units.
Mold mounting and platen interfaceMounting-face drawings, centering, patterns, support, permitted mounting method and configured platen-fit evidence.Identity, article and engineering-data fields do not release the mechanical mounting interface.
Automatic mold-change packageClamping, transfer, ejector, service couplings, functional and safety-related boundaries for the configured mold-changing system.A mold identifier may be an input, but it does not release the changing device, sequence or safety validation.
Hot-runner controller interfaceMold-specific zones, heaters, thermocouples, plugs, valve-gate functions, controller scope and configured evidence.A hot-runner reference inside engineering data is not a supplied controller, wiring map or runtime implementation.
Mold temperature-control interfaceControlled mold circuits, TCD/device zones, physical and utility responsibilities, value semantics and configured evidence.A mold-data record cannot release circuit layout, couplings, medium, utility capacity or thermal performance.
General machine-interface registerEvery physical, electrical, utility, functional, data, safety and access endpoint across the complete cell.This route narrows only the identified mold-data relationship and cannot replace the complete endpoint inventory.
IMM-to-MES data contractIdentified IMM and MES endpoints, jobs, cycles, datasets, write authority and reconciliation under the selected OPC 40077 release.A job or dataset carrying a mold ID does not prove a mold AAS record, direct mold endpoint or OPC 40082-5 implementation.
Mold protection and pressure evidenceMold-close protection windows and the separately defined injection, hydraulic-drive and in-cavity pressure meanings and evidence.A pressure or digital value category in a data model does not define a sensor chain, limit, reaction, protection setting or acceptance result.
FAT, SAT and production startupThe complete test programme, conditions, methods, witnesses, deviations, retest, first-off checks and production-release authority.This page names evidence rows to request; it supplies no test procedure, operating setting or authority to start production.
SOURCE STATUS / PROJECT EVIDENCE

Separate one Release, one Draft, one Release Candidate and the actual project record.

The source title and status guide questions; only configured project evidence releases an implementation.

Mold data layers, official status, useful questions and non-transfer boundaries
LayerSource and statusMay informCannot release
Mold identificationEUROMAP 101.1 / IDTA 02038-1
Release 1.0, July 2025; official history records publication on 2025-07-22
Questions about mold/article identity, owner or affiliation, asset ID, component name and location.Physical fit, runtime behavior, a controller, an interface implementation or a supplier capability.
Design-time engineering recordEUROMAP 101.2 / IDTA 02038-2
Draft 1.0, January 2026; review period started on 2026-01-13
Questions about article, material, assumed machine data, peripheral and injection-unit context, hot-runner data and mold description.A final standard, mandatory buyer template, verified machine fit, runtime values or supplier conformity.
Runtime mold data exchangeEUROMAP 82.5 / OPC 40082-5 / VDMA 40082-5
Release Candidate 1.0.0; series page says published 2024-07-30 while the PDF cover is dated 2024-09-01
Questions about identification, configuration, user, operation, process-value categories, cycle information and maintenance scope.An endpoint, node map, read/write function, security design, safety signal, interoperability, conformance or delivered implementation.
Configured project releaseBuyer, mold owner, machine supplier, integrator and site records
Project-specific controlled evidence; not supplied by a standard title
The exact endpoints, revisions, supported items, permissions, observed results, deviations, owners and as-built files.Any unobserved function, another configuration, another mold, another site or a universal result.
RFQ / MOLD DATA REGISTER

Twenty fixed fields expose identity, data, authority and handover gaps.

Complete every row for the identified project; preserve unsupported and disputed items.

Twenty mold identification and data-interface RFQ fields with requested evidence
Register fieldRecord for the proposed relationshipEvidence to request
Project and mold-data boundaryBusiness decision supported, identified mold/machine/cell relationship, included work, integration work, site work and explicit exclusionsApproved scope diagram and responsibility matrix naming the mold owner, toolmaker, machine supplier, integrator, MES/PLM parties and site owners
Mold identity and ownershipOwner or affiliation, toolmaker, model/type designation, serial or unique identifier, buyer asset ID, component name and current location schemeControlled nameplate/identity record with source, revision, owner and conflicts left open
Article identity and revisionEvery intended article/part ID and name, product owner, drawing or specification revision and multi-article relationshipApproved article register linked to the released product and mold documentation
Mold document and drawing indexCurrent mold assembly, cavity, electrical, hydraulic/pneumatic, hot-runner, thermal-circuit and handover-document references with revision statusControlled document index showing supplied, approved, superseded and missing records
Intended IMM and cell baselineExact machine identity when assigned, controller/application revision, injection unit and installed option baseline, cell identity and responsible ownersConfiguration record tied to the proposed project rather than a generic series or controller name
Identity source and system of recordDigital nameplate, EUROMAP 101.1/AAS or other record proposed; authoritative owner; storage location; update path; offline availability and conflict ruleSource declaration and representative controlled record without credentials or confidential infrastructure details
Engineering-data source and statusEUROMAP 101.2 Draft or other handover structure proposed, document revision, data owner, assumptions, engineered results and unsupported fieldsField-level applicability matrix that preserves Draft status and links each populated item to its project source
Mold configuration variantsPossible configuration identities, distinguishing features, allowed relationships, current active configuration and authority to approve a changeControlled configuration register plus approved observation or document for the delivered arrangement
Cavity topology and active stateCavity count and identities, layout reference, active/disabled state meaning, change ownership and relationship to article and production recordsCavity map and configured comparison; no cavity state is inferred from a total count alone
Mold-side controller or endpoint identityExact mold device/controller, software and application revision, endpoint owner, installation location and relationship to the machine or higher-level systemConfiguration-specific implementation declaration; leave the field open when no direct endpoint is proposed
Runtime specification and releaseEUROMAP 82.5 / OPC 40082-5 / VDMA 40082-5 release and status, related common-types release and controlled project extensionsDated applicability record distinguishing Release Candidate scope from actual implementation and vendor-specific additions
Supported runtime data categoriesProposed identification, configuration, user, operation, process-value, cycle-information and maintenance categories with included and excluded scopeConfiguration-specific support matrix and planned evidence; a specification title alone is insufficient
Process-value semanticsRequired temperature, pressure, flow, distance, force or digital-value meaning, source/measurement location, unit, timestamp, status/quality and validity boundaryField dictionary tied to the proposed sensors/devices and configured observations, without universal values or thresholds
Cycle, cavity and quality semanticsCycle identity, mold and cavity count meanings, active job relationship, quality-state owner, actual/average-time meaning and missing or disputed record treatmentApproved semantic matrix and traceable project observations; no data field is treated as proof of part quality by itself
Counters and reset/change ownershipMold-lifetime, job and cavity counter source, initial state, increment meaning, persistence, reconciliation, reset/change authority and audit requirementBaseline and controlled change record with owner, reason and affected downstream records
Maintenance information boundaryRequired maintenance identities, source documents, status or alarm meaning, remaining-interval semantics, acknowledgement/reset ownership and explicit exclusionsProject maintenance-information matrix and document references; no interval or procedure is prescribed here
Read, write, method and event authorityEvery proposed data direction, event, write or method family, business purpose, initiating/receiving owner, approval prerequisite and denied functionAllowlisted authority matrix and configured observation under the approved acceptance plan, without publishing a node map or action sequence
User, access and cybersecurity ownershipUser/login relationship, account and role owner, network/security responsibilities, certificate lifecycle, logging, backup/update boundary and hardwired/safety separationBuyer-approved responsibility record; no account, credential, certificate, port or security architecture is published
FAT/SAT evidence and deviationsSelected identity, configuration, read/write, process-value, event, disconnect/reconnect and handover observations; conditions, witnesses, deviations and retest ownerSigned configuration-specific record linked to the complete FAT/SAT programme rather than a universal test procedure
As-built handover and revalidationFinal identities, mappings, document revisions, supported/unsupported scope, backups, deviations, approval owner and triggers after mold, controller, machine, software or interface changeReleased as-built index and change-control record retaining superseded versions and open actions
PRIMARY SOURCES / BOUNDARY

Use official mold identity, engineering and runtime documents without transferring an implementation.

Reviewed 1 August 2026. EUROMAP 101.1 is identified as Release 1.0, EUROMAP 101.2 as Draft 1.0 and EUROMAP 82.5 as Release Candidate 1.0.0. Official publication dates and running labels are retained where they disagree. None proves a NEW ORIENTAL IMM digital mold, AAS, OPC UA endpoint, RFID system, data collection, integration, interoperability, certification, result or case.

EUROMAP

EUROMAP 82 — OPC UA for Peripheral Devices

The official series page lists EUROMAP 82.5 Moulds as a Release Candidate, says its RC was published on 30 July 2024 and describes identification/configuration, user login and process-value monitoring/control as series-level categories.

Boundary: A series page does not prove an endpoint, installed function, data item, interoperability, conformance, safety function or NEW ORIENTAL IMM implementation.

EUROMAP / OPC Foundation

EUROMAP 82.5 / OPC 40082-5 Release Candidate 1.0.0 — Moulds

The official PDF identifies Release Candidate 1.0.0, dated 2024-09-01, for mold data exchange during operation and exposes identification, configuration, user, operation, process-value, cycle and maintenance categories. It excludes safety-related signals such as emergency stop.

Boundary: Only high-level categories become RFQ questions. No node map, method signature, write right, sequence, value, security design or implementation claim is transferred.

EUROMAP / IDTA

EUROMAP 101 — Asset Administration Shell Submodels for Moulds

The official page identifies EUROMAP 101.1 Identification as Release 1.0 published 22 July 2025 and EUROMAP 101.2 Engineering Data as Draft 1.0 published 13 January 2026; it states that the broader series remains under development.

Boundary: Do not present all planned submodels as released or infer an AAS, digital twin, implementation, compatibility, certification or supplier capability.

EUROMAP / IDTA

EUROMAP 101.1 Release 1.0 — Plastics and Rubber Moulds: Identification

The official cover and history identify Release 1.0, July 2025, while the running footer still says Version Draft 1.0. The public model exposes mold/article identity, owner/affiliation, asset ID, component name and location questions.

Boundary: The publication-status inconsistency stays visible. Identity fields do not prove physical fit, runtime behavior, an interface, an AAS deployment or a NEW ORIENTAL IMM implementation.

EUROMAP / IDTA

EUROMAP 101.2 Draft 1.0 — Plastics and Rubber Moulds: Engineering Data

The January 2026 draft describes design handover and pre-production equipment-selection use cases and organizes engineering information around articles/materials, assumed machine/peripheral data, hot runners and the mold description. It distinguishes static/lifecycle AAS information from dynamic OPC UA process data.

Boundary: Draft 1.0 is not a final standard, mandatory project template, validated design, fit result, runtime implementation, supplier conformity or delivered case.

BUYER QUESTIONS

Injection molding mold identification and data interface FAQ

The answers keep identity, engineering records, runtime data and project acceptance inside their separate evidence boundaries.

01Does a digital-mold or OPC UA label prove that the mold and machine can exchange data?

No. Identify the exact mold/controller and machine endpoints, software revisions, selected specification release, supported categories, read/write/event authority and configuration-specific observations. Keep every unsupported item visible.

02Are EUROMAP 101.1, EUROMAP 101.2 and EUROMAP 82.5 the same data layer?

No. EUROMAP 101.1 Release 1.0 covers mold identification; EUROMAP 101.2 Draft 1.0 covers design-time engineering data; EUROMAP 82.5 Release Candidate covers runtime mold data exchange. A project still needs its own implementation and acceptance record.

03Why do the official EUROMAP dates and document labels need a note?

The EUROMAP 82 series page says the 82.5 RC was published on 30 July 2024, while the PDF cover is dated 1 September 2024. The EUROMAP 101.1 cover and history say Release 1.0, but its running footer still says Draft. Preserve both source records rather than silently normalizing them.

04Can a mold identity record prove that the mold physically fits the proposed machine?

No. Use the separate mold-envelope and mold-mounting records for dimensions, mass, tie bars, platens, centering, patterns, support and mounting method. The identity record only links the controlled asset and documents.

05Does a process-value field prove the measurement or part quality?

No. Record the actual sensor/device, measurement location, unit, timestamp, status/quality semantics and acceptance evidence. A data category or value alone does not establish measurement validity, a limit, a reaction or molded-part quality.

06Does this checklist define cybersecurity, safety or operating instructions?

No. It names the responsible records and keeps ordinary data exchange separate from safety functions. Buyer IT/OT, machine, mold, integrator and site safety owners define and approve the architecture, validation and procedures.

07What should the mold-data RFQ include?

Include the controlled mold, article, document and target-machine identities; engineering-data source; configurations and cavities; endpoint and release; supported data categories; value/counter/maintenance semantics; permissions; access ownership; FAT/SAT evidence; deviations; and as-built change control.

RFQ / MOLD IDENTITY + DATA

Send one controlled mold-data relationship for review.

Attach the mold, article, document and target-machine identities; engineering-data source and status; configurations and cavity map; proposed endpoint and selected release; supported runtime categories; value, counter and maintenance semantics; permissions and access ownership; configured FAT/SAT evidence; deviations; and as-built change controls. Keep every unconfirmed digital-mold, AAS, OPC UA, RFID, data, integration, interoperability, certification and result claim open.