04
RFQ / PROJECT FIT

A better brief produces a better machine shortlist.

Use this worksheet to organize the inputs needed to evaluate clamping unit, injection unit, drive architecture, auxiliaries and production-cell integration.

ATTACH IF AVAILABLE

Give engineering the source files.

  1. 012D or 3D part drawing
  2. 02Mold drawing and external dimensions
  3. 03Resin grade and material data sheet
  4. 04Current machine and cycle record
  5. 05Factory layout and utility standard
  6. 06Destination-market documentation needs
Your data stays with you

The worksheet runs in your browser. Nothing is uploaded. A buyer basis explicitly continued from the specification tool is read once from this tab's session storage and deleted immediately; an allowlisted guide token only reveals its fixed empty fields and never copies arbitrary query values. The worksheet then creates a plain-text project brief you can review and copy.

Inquiry source: [NO-IMM] · NEW ORIENTAL IMM · xdfmolding.com
Preparation path: Direct Project Fit Brief
No email or account required. This worksheet creates share-ready text in your browser and does not upload or send the entries. After creating the brief, you can open the shared export WhatsApp desk with the text prefilled; review it and press send in WhatsApp yourself. Any one-time handoff is deleted from session storage as soon as this page reads it; the imported values then remain only on this page. Keep the text file with your drawings.

PROJECT REVIEW PATH

Four conversations that move a project forward.

01

Completeness check

Identify missing part, mold, resin or output data before quoting.

02

Machine fit

Compare architecture and critical configuration against the project inputs.

03

Scope & acceptance

Define options, auxiliaries, interfaces, testing and exclusions.

04

Quotation scope

Align machine, options, delivery basis, installation and service terms.

PLANT-WIDE MATERIAL SCOPE

Does the project include central storage, routing, orders or material-trace evidence?

Define the materials, sources, destinations, routes, supply orders, lots, exceptions and reconciliation boundary before placing those requirements inside the machine and cell brief.

Open the central material-supply checklist
Keep separate
  • Machine project fit and plant-wide material routing
  • IMM-to-MES jobs and material-supply orders
  • Standard scope and configured evidence
CAVITY-PRESSURE MEASUREMENT SCOPE

Does the project include in-mold pressure sensing or a process-monitoring output?

Define the mold, cavities, sensor relationship, complete channel, measurement semantics, decision owner and configured evidence before placing monitoring requirements inside the machine and cell brief.

Open the cavity-pressure measurement checklist
Keep separate
  • Pressure field and installed measurement chain
  • Monitoring output and physical part disposition
  • Named vendor example and configured support
MAXIMUM CLAMPING-FORCE ACCEPTANCE

Must the exact machine's maximum clamping force be test-agreed and accepted?

Keep the nominal/rated value separate from the selected method, measurement chain, raw record, reported result, limitations, contractual criterion and final disposition.

Open the maximum-force acceptance checklist
Keep separate
  • Mold/process clamp demand and machine capability
  • Nominal label and measured result
  • Performance evidence and safety/conformity
PLATEN-PARALLELISM ACCEPTANCE

Does the project require a separate platen-parallelism record?

Keep the selected method and edition, machine state, datums, measurement locations, raw readings, result expression, limitations, contractual criterion and final disposition together.

Open the platen-parallelism acceptance checklist
Keep separate
  • Platen drawings and measured parallelism
  • Maximum clamping force and parallelism evidence
  • Performance evidence and safety/conformity
NOMINAL OPENING-FORCE ACCEPTANCE

Must the exact machine's nominal opening-force claim be test-agreed and accepted?

Keep the quoted definition/value/unit separate from the selected method, opening-state basis, measurement chain, raw observations, reported result, limitations and final disposition.

Open the nominal opening-force acceptance checklist
Keep separate
  • Quoted value, controller entry and controlled result
  • Opening force, stroke, daylight and mold access
  • Opening force, demolding, ejector, cycle and safety
PLASTICIZING-CAPACITY ACCEPTANCE

Must the exact machine's quoted plasticizing-capacity field be test-agreed and accepted?

Keep the quoted definition, value, unit and reference material separate from the selected method, exact plasticizing configuration, controlled conditions, measurement chain, raw observations, result, limitations and final disposition.

Open the plasticizing-capacity acceptance checklist
Keep separate
  • Quoted comparison field and required project recovery
  • EUROMAP 19 and EUROMAP 4 evidence questions
  • Machine-side result, production output and material suitability
ACTUAL-INJECTION-EFFICIENCY ACCEPTANCE

Must the exact injection unit's quoted EUROMAP 4 field be test-agreed and accepted?

Keep the original field and exact screw-or-plunger configuration together with the selected method, theoretical basis, controlled test state, measurement chain, raw observations, calculation, limitations and final disposition.

Open the actual-injection-efficiency acceptance checklist
Keep separate
  • EUROMAP 4 coefficient and energy efficiency
  • Comparison record and pressure/flow capability
  • Machine-side result, production output and part quality
HYDRAULIC-FLUID CLEANLINESS ACCEPTANCE

Must the exact hydraulic circuit's cleanliness and filtration evidence be agreed before acceptance?

Keep the machine, circuit, fluid fill and filter state together with the buyer-owned target, controlled sample chain, selected method, instrument traceability, raw particle data, reported code, limitations and final disposition.

Open the hydraulic-fluid cleanliness acceptance checklist
Keep separate
  • Drive architecture and the configured cleanliness record
  • Pressure/flow endpoints and particle-contamination evidence
  • Filter-element data and installed-circuit acceptance
WhatsApp+86 134 1703 0422