| Exact machine and clamping-unit configuration | Machine identity, clamping architecture, included drive/control configuration, relevant revisions and the physical unit presented for acceptance | Controlled identity/configuration record that prevents a series name or another machine from standing in for the tested unit |
|---|
| Controlled quotation and specification revision | Quotation, technical specification, clamping-unit data and amendment revisions that define the purchased and inspected scope | Buyer-approved document index with superseded revisions retained and conflicts still visible |
|---|
| Quoted nominal opening-force definition, value and unit | Exact supplier label, definition, value, unit and source document, including whether the entry is nominal, rated, set, calculated or measured | Controlled supplier statement without treating a catalogue value, controller entry or drive rating as a measured result |
|---|
| Decision purpose and acceptance stage | Buyer decision served, factory/site stage, release boundary and questions deliberately excluded | Approved acceptance matrix showing why the record is needed and which later decisions remain open |
|---|
| Selected method and edition | Named method, document number, year or edition, applicability decision, agreed amendments and responsible method owner | Contract-controlled reference; this page supplies no default method and reproduces no protected procedure detail |
|---|
| Contractual scope and document precedence | Included parties, responsibilities, deliverables, exclusions, acceptance authority and precedence among purchase documents | Signed requirement matrix retaining unresolved conflicts rather than filling them from generic guidance |
|---|
| Machine and environmental preconditions | Required machine state, preparation, environment, stabilization basis, safety controls and limitation owners for the agreed test | Method- and machine-specific approved condition record; this page prescribes no setup value |
|---|
| Opening state and movement-window basis | The agreed machine state and movement boundary over which the opening-force result applies, with state identification and exclusions | Controlled method/test-state record; this page supplies no default position, speed, stroke, load or movement window |
|---|
| Mold, fixture and installed-load state | Whether a mold, fixture or other relevant component is installed and the exact configuration to which the observation applies | Released configuration record without assuming that one installed-load state transfers to another |
|---|
| Measurement principle and force path | The physical measurement principle, relationship to the clamping/opening system, interpretation and declared limitations | Configuration-specific technical statement from the responsible test party without a default instrument or principle |
|---|
| Measurement locations and channel mapping | Every agreed location, reference system, channel relationship, mapping and responsibility for installed or temporary equipment | Released drawing or method record; no universal location or force-path inference is supplied |
|---|
| Instrument identity and range | Instrument manufacturer/model/serial identity, configured range, unit, revision, connection and applicability declaration | Device-specific record from the responsible party; no instrument, range or accuracy is attributed to NEW ORIENTAL IMM |
|---|
| Calibration or verification traceability | Calibration or verification record, date/status, traceability statement, applicability and limitation owner | Dated instrument-specific evidence; no interval, laboratory, method, accuracy or traceability claim is supplied here |
|---|
| Repetitions, sequence reference and raw observations | The contract-agreed observation count, sequence reference, unrounded raw entries, invalid observations and retained data location | Complete signed/raw record with exclusions explained; this page sets no repetition count or sequence |
|---|
| Reported result, expression and unit | Reported nominal opening-force result, expression/unit, calculation and rounding treatment, source record and responsible reporter | Machine- and state-specific report clearly separated from the quoted value, controller entries and drive ratings |
|---|
| Uncertainty and stated limitations | Declared measurement uncertainty where supplied, method/instrument limitations, excluded effects and interpretation boundary | Responsible-party statement; absence remains visible and no generic accuracy or repeatability is inferred |
|---|
| Project criterion and responsible approver | Contract source for the project-specific criterion, expression/unit, approval status, exception authority and named role | Buyer/supplier-approved requirement; no allowable deviation, tolerance or pass/fail rule is supplied by this page |
|---|
| Witnesses, deviations, retest, report disposition and change triggers | Required witnesses, observations, deviations, containment, retest decision, approvals, final report location and events requiring review | Signed disposition record that does not turn a partial observation, unsigned draft or changed machine state into acceptance |
|---|